Work Episode 1

Overview of the project

Project Title: Quality Analysis of Landfill leachate treatment & its treatment by Distillation Dates of Project: August 2005 to May 2006 (10 Months) Name of Organization: P.G Environmental Engineering Department, PEC University of Technology, Chandigarh (Formally Punjab Engineering College, Chandigarh) Location: University My Role: Student of Master of Environmental Engineering

Objective of the Project

I completed my project under the guidance of Assistant Professor Shakti Kumar. Leachate was tested for various parameters like concentration of Chlorides, Sulphates, Chemical oxygen Demand (COD) and pH using methods given in “Standard Methods for Examination of water and waste water” published by “American Public health Association”. One stage distillation was done on Landfill Leachate sample to study the changes in Leachate quality parameters.

For examining two stages distillation process, the distillate from the stage one was used as feed to the second stage. With this I have compared the changes that have occurred in Quality parameters of Landfill Leachate before and after the treatment of one sage and two stage distillation of landfill leachate. The effect of landfill Leachate on the Ground water Quality was also studied.

Background

Federal university of ABC is a renowned Brazilian institution with most part of the academic body holding Ph.D.

It was recognized as the unique Brazilian University with impact factor in scientific publications above average according to SCImago Institutions Rankings (Source: http://www.scimagoir.com/). The university and the engineering courses were created in 2005.

The project was the last requirement to get my engineering diploma. I was appointed as team lead engineer for this project. After an intense research, I found a lack in the Brazilian market, where there was not any electronic device able to automatically, with good accuracy and repeatability, prepare some chemical process like chemical solution dilution in a reasonable price/amount for a small company or laboratory.

Roles & Responsibilities

  • Taking permissions from the government department for collecting samples of leachate from DadduMajra Landfill site and Hand pump water from near the landfill site
  • Literature survey from the research papers to plan the work to be done for the Master’s thesis
  • Preparation of the methodology of the experimental work
  • Arrangement of experimental setup in the Environmental Engineering Laboratory
  • Carrying our experimental runs
  • Analyzing the data collected from the experimental runs
  • Preparation of the results and discussion chapter based on experimental analysis

Since I was the only project patron so I managed all the project management by myself.

To read more check the pdf page number 19 given below

Work Episode 2

Overview of the project

Project Title: Technical proposal for making 900 MLD (Million Litre/Day) Water Treatment Plant Dates of Project: April 2007 to December 2007 (Nine Months) Name of Organization: Suez India (Pvt) Ltd Location: Gurgaon, Mumbai, India My Role: I worked as Engineer for Technical Proposal Manager & my duty included making Technical Proposal & doing calculations along with the design work.

Background

Mumbai is the largest city in India and often called as economic capital of India. Mumbai and surrounding suburbs are home to around 20 million Indians. Population of this city is increasing as more and more people are migrating from smaller town to big cities in India for job opportunities. This has increased the demand of drinking water.

Objective of the Project

In the year 2007, Municipal Corporation of Mumbai invited bids from water treatment expert companies to construct the 900 Million Liters per day water treatment plant at Bhandup. Suez India made a successful bid and after the technical and commercial negotiations won the project. I and my team played an important role in this project. I worked with my technical manager Mr. Yogesh. D Chaware.

Roles & Responsibilities

  • Preparing the process calculations and checking the calculations for the process design prepared by the Technical Manager
  • Development of the P&ID and GA drawings. For the drafting purpose one draftsman was allocated to me.
  • Preparing technical specifications for the techno commercial proposals from specialized sub vendors like centrifuge and process equipment suppliers. I was part of the Suez TechnicalExpert’s team.
  • Reviewing the technical proposal submitted by specialized sub-vendors and communicating with their technical staff for the technical correction work.
  • Preparing the technical data sheets which are to be submitted with the technical proposal.
  • Preparation and correction of the design report to be submitted to the project owner’s consultant for review.
  • Preparation of the support technical documents to be submitted to owner’s engineer for review.
  • Preparation of all the documents to handover from Technical proposal side to the Project execution team after we had a successful award of contract.
  • I have selected the equipment for the plant which was entirely environmental friendly with Minimum carbon emission in any form.
To read more check the pdf page number 26 given below..

Work Episode 3

Overview of the project

Project Title: 40 m3/hr. Potable water Treatment Plant for 2800 MW Gas based Rabigh Power Plant
Dates of Project: June 2011 to December 2012
Name of Organization: Doosan Heavy Industries & Construction Co. Ltd(DHI), EPC Business group (Water Treatment Section)
Location: Saudi Arabia
My Role: Environmental Engineering

Objective of the Project

The 40 m3/hr Potable water Treatment plant was designed by me designed to treat distilled water, continuously adding specific chemical solutions by means of dedicated dosing systems, in order to make the water potable according to WHO recommendations.

Background

In the year 2011 DHI won 4 billion USD Project for the construction of 2800 MW gas based power plant. This was one of the biggest projects constructed by DHI. Before the start of the Power production it was important that we have an up to date new potable water treatment plant in order to fulfil the requirements of the drinking water for the staff and the colony of people working in the power plant. I calculated that 40 m3/hr Potable water treatment plants will be required for the potable water requirement of the power plant staff and the colony. I handed complete potable water project from basic design till the handover to the owner.

Roles & Responsibilities

I worked as responsible Engineer for the handling the complete potable water treatment system from concept development to the handover of the project. In detail my responsibility included calculating the Potable water demand for the complete power plant, Basic design, Detailed design, selection of vendor for supply of the tanks, Pumps and package vendor selection, handling design activities , finalization of specification of mechanical equipment, process design and submission to the owner for approvals, incorporating Owner’s comments. O&M documents preparation. I also have to interact with Electrical, I&C, architectural and Procurement teams for carrying out the associated activates of the Package items.

My roles & responsibilities were as following -

  • Preparing the Potable water demand calculations
  • Preparing the process calculations and dosing rates for various chemicals to make water fit for drinking as per WHO recommendation.
  • Preparing initial documents for submittal like PID for potable water treatment plant, Process Flow Diagram, Mass Balance , GA drawing, System description, etc.
  • Performing detailed engineering and submitting the documents for approval and incorporating the comments by client and revising submittals for approval.
  • Planning and carrying out meetings for the interface check with Architecture, Piping, Plumbing, utility departments for smooth interface at the terminal points.
  • Preparation of drawings for client submittal after the completion of the project
  • Handling selection and handling of sub vendor who supplied tanks, pumps and agitators and control Panel.
  • Preparation of the operation and maintenance manual for the Potable water treatment system for the operator of the plant before the handover of the plant.
To read more check the pdf page number 31 given below..

Work Episode 4

Overview of the project

Project Title: Technical proposal making & basic design for Pretreatment, Demineralization & waste water treatment Plants for 2X660 MW ‘’Jawaharpur Super thermal Power Pant’’ Dates of Project: October 2015 to October 2017 (24 months) Name of Organization: Doosan heavy Industries & Construction Co. Ltd, EPC Business Group. (Water Treatment Section) Location: Seoul, South Korea My Role: Environmental Engineer

Objective of the Project

The project was divided into three phases as written below.

  • Technical proposal making & basic design for the 4500 m3/hr Pre-treatment Plant (PT Plant)
  • Technical proposal making & basic design for the 80 m3/hr Demineralization Plant (DM)
  • Technical proposal making & basic design for the 250 m3/hr Waste Water Treatment Plant (WWTP)

Background

In the year 2015 Uttar Pradesh Rajya Vidyut Utpadan Nugam Limited floated the tender for the construction of 2x660 MW “Jawaharpur Super thermal Power Plant”, Uttar Pradesh, India. Doosan decided to make the Bid for this project. I was tasked to prepare the technical proposal and basic design was assigned to water treatment section. I was selected by my Team Head as responsible engineer to prepare the technical proposal and to carry out the basic design (in case Doosan wins the Project). In the year 2016 Doosan won the multimillion dollar project. I carried out work related to Technical proposal making and thereafter and basic design for 4500 m3/hr Pretreatment Plant (PT) Plant, 80m3/hr. Demineralization Plant (DM), and 250 m3/hr waste water treatment Plant.

Roles & Responsibilities

I worked as responsible Engineer for the Technical proposal making and Basic design for Pretreatment (PT), Demineralization Plant (DM) and waste water treatment Plants (WWTP) for 2x660 MW “Jawaharpur Super thermal Power Plant”, Uttar Pradesh, India. Responsibilities included calculating Pre-treatment water, Demineralized water, waste water requirements including Basic design, Detailed design review, selection of vendor for supply of package items, finalization of specification of process equipment, process design and submission of preliminary documents to owner. I also interacted with Electrical, I&C, architectural and Procurement teams for carrying out the associated activates of the Package items.

Detailed engineering was done by Doosan’s Indian subsidy (Doosan Power system India). As a responsible engineer of Head office for water Treatment section, I also have the responsibility of the detailed design review to check for any technical issues and to avoid any cost impact to the company. I have the responsibility to report to head of engineering that this project will be completed on time without any delay.

  • Preparing the water balance of biding stage to calculate water demand for Pretreatment Plant (PT Plant), Demineralization Plant (DM), Waste water Treatment Plant (WWTP)
  • Preparing the Key design data for Pretreatment Plant (PT Plant), Demineralization Plant (DM), Waste water Treatment Plant (WWTP) to float the material Purchase specifications for key process equipment
  • Preparing the preliminary process calculations for various units.
  • Reviewing the technical proposal submitted by specialized sub vendors and coordinating with water treatment engineer in the Indian branch office of Doosan.
  • Doing the Basic engineering and submitting the documents to client for approval
  • After the award of the contract; I carried out detailed technical review of the initial documents for client submittal like PID, Process Flow Diagram, Mass Balance, GA drawing, System description, etc. for Pretreatment Plant (PT Plant), Demineralization Plant (DM), Waste water Treatment Plant (WWTP)
  • Supporting the engineer in Doosan Power system India in arranging the technical meetings with the vendors and providing all the technical support from head office
  • Planning and carrying out meetings for the interface check with Architecture, Piping, Plumbing, Utility departments for smooth interface at the terminal points.
  • Keeping the project deadline and reporting to the head of water treatment section on weekly basis about the status of technical document submittals for Pretreatment Plant (PT Plant), Demineralization Plant (DM), Waste water Treatment Plant (WWTP).
To read more check the pdf page number 36 given below