Electrical engineer CDR sample

PROFESSIONAL ENGINEER Summary Statement Sample 2

These are the competency Units and Elements. These elements must be addressed in the Summary Statement (see Section C). If you are applying for assessment as a Professional Engineer, you will need to download this page, complete it and lodge it with your application.

Competency Element A brief summary of how you have applied the element The paragraph in the career episode(s) where the element is addressed
PE1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive, theory-based understanding of the underpinning natural and physical sciences and the engineering fundamentals applicable to the engineering discipline.

I possess deep knowledge and professional expertise in the Electrical Engineering, mathematics and physics. I have a thorough understanding of the underlying physical sciences gained through academic degrees, professional exposure, and continuous self-development.

I possess in-depth knowledge of construction, expansion, and commissioning of substations and power plants, protection and automation systems, design principles for low voltage equipment and communications. Also possess understanding regarding the cost-efficient procurement strategies, placing bids, request for quotation, value engineering, and supplier relationship management skills.

CE 1.1, CE 1.6, CE 1.13, CE 1.29 CE 2.1, CE 2.6, CE 2.29, CE 3.1, CE 3.2, CE 3.8, CE 3.20, CE 3.23, CE 3.25

CE 1.3, CE 1.4, CE 1.6, CE 1.12, CE 1.13, CE 2.3, CE 2.4, CE 2.6, CE 2.12, CE 2.22, CE 3.4, CE 3.7, CE 3.8, CE 3.15

PE1.2 Conceptual understanding of the mathematics, numerical analysis, statistics and computer and information sciences which underpin the engineering discipline

I leveraged mathematics and numerical analysis to perform calculations and support my decision making and aid in the design functionalities in my projects.

I used software to derive crucial design inputs and enhance the productivity of the projects. SAP for contracts, Click for Suppliers (C4S), New Costing Tool for uploading calculated costs, an ERP system, Siyspro for electrical equipment tracking, PTT-PMA for project risks and opportunities and ACOM for commenting on customer technical specifications.

I also utilized schematics, design principles of low voltage equipment to perform various tasks in my projects.

CE 1.9, CE 1.22, CE 2.9, CE 2.12, CE 3.12, CE 3.15

CE 2.14, CE 3.17

CE 1.22, CE 2.22, CE 3.15

PE1.3 In-depth understanding of specialist bodies of knowledge within the engineering discipline

I possess knowledge and expertise on a construction of substations and power plants, design of low voltage equipment, protection and substation automation systems, communications, the addition of 700 MW and 2200 MW to the grid, MV switchgear, design of low voltage cables and fire alarm systems and handling of electrical material.

I used an ERP system for material tracking of the project. All information about the project was recorded through ERP system.

CE 1.3, CE 1.4, CE 1.6, CE 1.8, CE 1.12, CE 1.13, CE 1.18, CE 1.22 CE 2.3, CE 2.4, CE 2.6, CE 2.8, CE 2.12, CE 2.22, CE 3.4, CE 3.6, CE 3.7, CE 3.15

CE 1.14, CE 2.14

PE1.4 Discernment of knowledge development and research directions within the engineering discipline

I performed in-depth analysis to identify the issues which occurred during my projects and provided solutions to tackle those issues. I also performed cable cross-section analysis to maintain the cable cost.

I worked in the construction of a substation, stepping down transmission voltage to sub-transmission voltage and purchased all the electrical material required for its construction.

I managed the increasing electricity demand by contributing to add additional megawatts to the power plant. I had to deliver and purchase generators, gas turbines, steam turbines, main power transformers, isolated phase bus duct, generator circuit breaker, auxiliary transformers, HV/MV/LV cables, MV & LV switchgear, cable support structures, protection and synchronization, batteries and chargers, lighting and small power, communication, and security systems.

I also contributed in the bidding for construction of an independent power plant to add additional 2200 megawatts to the grid and for this purpose prepared request for proposal for engineering equipment.

CE 1.7 CE 1.18, CE 2.7, CE 2.13, CE 3.9, CE 3.10, CE 3.11

CE 1.4, CE 1.6, CE 1.13 CE 1.18, CE 1.20, CE 1.22

CE 2.3, CE 2.4, CE 2.6

CE 3.4, CE 3.7, CE 3.8

PE1.5 Knowledge of contextual factors impacting the engineering discipline

I applied my knowledge of related scientific factors like careful design of low voltage equipment, protection and substation automation systems, communications, the addition of 700 MW and 2200 MW to the grid, design of low voltage cables and fire alarm systems, handling of electrical material, and safety measures for hazardous energy control.

I prepared a report for Material Tracking, the request for quotations for purchasing electrical material and for placing a bid. Moreover, I prepared price comparison sheet, contract drafts, purchasing the manual, purchasing schedules, project sourcing strategy, and project status sheet for electrical commodity and negotiated the delivery, payment terms, prices, and other commercial conditions with vendors.

I attended a Kickoff meeting with customers and project team. Team meetings with the project, Progress update meetings with customers and top management and Clarifications meetings with suppliers/ vendors.

I attended “Electrical Cables Training and Financial skills for non-financial professionals” training at Siemens office, Dubai and Siemens office, Riyadh respectively. I also attended a workshop on Negotiation Excellence at Siemens Dubai in 2017.

CE 1.6, CE 1.12, CE 1.13, CE 1.18, CE 1.22, CE 1.24, CE 2.3, CE 2.4, CE 2.8 CE 2.24, CE 3.7, CE 3.24

CE 1.6, CE 1.18, CE1.20, CE 1.21, CE1.25, CE 1.26, CE 1.29 CE 2.6, CE 2.18, CE.2.21 CE 2.25, CE 2.26, CE 2.29, CE 3.7, CE 3.8, CE 3.15, CE 3.16, CE 3.21, CE 3.22

CE 1.10, CE 2.10, CE 3.13

CE 1.10, CE 2.10, CE 3.13

PE1.6 Understanding of the scope, principles, norms, accountabilities, and bounds of contemporary engineering practice in the specific discipline

I followed a structured approach to my projects to resolve the issues and enhance the productivity of the project and ensure best time optimization.

I didn’t have any members who were working under my supervision, as I had to report directly to my functional manager. However, I was leading the vendors/ suppliers for managing and handling the purchases of materials for the project according to the contract terms.

CE 1.7, CE 1.12, CE 1.18, CE 1.28, CE 1.29 CE 2.7, CE 2.12, CE 2.13, CE 2.19, CE 2.28, CE 2.29 CE 3.9, CE 3.10, CE 3.11 CE 3.16, CE 3.25

CE 1.20, CE 2.20, CE 3.21

PE2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of established engineering methods to complex engineering problem solving

I utilized my engineering knowledge and professional expertise to solve project challenges through innovative means.

I focused on engineering calculations in my projects to ensure the quality of work. I performed extensive numerical and engineering calculations and analysis in my projects to draw effective conclusions.

CE 1.7 CE 1.18, CE 2.7, CE 2.13, CE 3.9, CE 3.10, CE 3.11

CE 1.9, CE 1.22, CE 1.29, CE 2.9, CE 2.12, CE 2.29, CE 3.12, CE 3.15, CE 3.25

PE2.2 Fluent application of engineering techniques, tools, and resources

I utilized all my professional knowledge of electrical engineering and procurement concepts to resolve the issues which occurred during the project. Design of low voltage equipment, protection and substation automation systems, communications, the addition of extra power to the grid, design of low voltage cables and fire alarm systems.

I have leveraged engineering software and equipment to accelerate the project.

CE 1.6, CE 1.7, CE 1.12, CE 1.13, CE 1.18, CE 1.22, CE 1.24, CE 2.3, CE 2.4, CE 2.8 CE 2.13, CE 2.24, CE 3.7, CE 3.9, CE 3.10, CE 3.11, CE 3.24

CE 2.14, CE 3.17

PE2.3 Application of systematic engineering synthesis and design processes

In all my projects I carried out an extensive analysis of the operation of the plants to resolve challenging issues and achieve goals of the projects.

I took immediate actions and made prompt decisions after consulting my managers and other team members to resolve the issues and ensure efficient operation of the plants.

I introduced new strategies for purchasing such as Design to Cost, e-Auction, Bundling Supplier Day and Introduction of New Challengers.

CE 1.7 CE 1.18, CE 1.29 CE 2.7, CE 2.13, CE 2.29 CE 3.9, CE 3.10, CE 3.11 CE 3.25

CE 1.15, CE 1.16, CE 1.17CE 1.20, CE 1.21, CE 1.23 CE 2.15, CE 2.16, CE 2.17 CE 2.20, CE 2.27, CE 3.18, CE 3.19, CE 3.21 CE 3.25

CE 1.26, CE 2.26, CE 3.16

PE2.4 Application of systematic approaches to the conduct and management of engineering projects

My projects met all their original objectives and were well appreciated.

I offered the speedy resolution to the projects' problems and ensured the progress. I had full focus on cost and economic factors throughout my projects.

CE 1.29, CE 2.29, CE 3.25

CE 1.7, CE 1.18, CE 1.26, CE 1.29 CE 2.7, CE 2.13, CE 2.26, CE 2.29 CE 3.9, CE 3.10, CE 3.11, CE 3.25

PE3 PROFESSIONAL AND PERSONAL ATTRIBUTES
PE3.1 Ethical conduct and professional accountability

My projects were focused on company and stakeholders' satisfaction. All my projects were accepted and praised by the target audience.

In my projects, I identified challenges and problems and addressed them.

I utilized engineering standards IEC, ANSI, and IEEE ISO, IEC, and NFPA and DIN codes during the projects.

CE 1.2, CE 1.3, CE 1.4, CE 1.29 CE 2.3, CE 2.4, CE 2.5 CE 2.29 CE 3.3, CE 3.4, CE 3.6 CE 3.7, CE 3.25, CE 3.17

CE 1.7, CE 1.18, CE 2.7, CE 2.13, CE 3.9, CE 3.10, CE 3.11

CE 1.11 CE 2.11, CE 3.14

PE3.2 Effective oral and written communication in professional and lay domains

I ensured extensive documentation in my projects in English. I prepared a report for Material Tracking. Price comparison sheet, Contract Drafts, Purchasing Manual, Purchasing Schedule, Project Sourcing Strategy, and Project status Sheet for Electrical Commodity and presented them for the managers and the clients to elaborate the successful execution of the projects.

I also attended Negotiation Excellence @ Siemens Course, Media Rotana Hotel, Dubai in November 2017.

I ensured proper coordination and feedback within the team as well as with my project managers and director.

CE 1.6, CE 1.18, CE1.20, CE 1.21, CE1.25, CE 1.26, CE 1.29 CE 2.6, CE 2.18, CE.2.21 CE 2.25, CE 2.26, CE 2.29, CE 3.7, CE 3.8, CE 3.15, CE 3.16, CE 3.21, CE 3.22

CE 3.13

CE 1.15, CE 1.16 CE 1.17 CE 1.21 CE 1.23 CE 2.15, CE 2.16, CE 2.17 CE 2.27, CE 3.18, CE 3.19, CE 3.21

PE3.3 Creative innovative and proactive demeanor

I brought in innovative and practical solutions to the project challenges faced. The timely resolutions ensured timely completion of my projects.

CE 1.7, CE 1.12, CE 1.18, CE 1.28, CE 1.29 CE 2.7, CE 2.12, CE 2.13, CE 2.19, CE 2.28, CE 2.29 CE 3.9, CE 3.10, CE 3.11 CE 3.16, CE 3.25

PE3.4 Professional use and management of information

I utilized all my engineering knowledge and skills to accomplish the objectives and goals of the projects. I utilized my expertise and vigilant observation to analyze the issues which occurred during the projects and resolved them efficiently.

I analyzed the basic plans and the strategies regarding the construction of plants and ensured proper and on time delivery of electrical equipment.

CE 1.1, CE 1.6, CE 1.7, CE 1.13, CE 1.18, CE 2.1, CE 2.6, E 2.7, CE 2.13, CE 2.29, CE 3.1, CE 3.2, CE 3.9, CE 3.10, CE 3.11

CE 1.26, CE 1.20, CE 1.22 CE 2.22, CE 2.26, CE 3.16

PE3.5 Orderly management of self, and professional conduct

I have been sensitive to time at all stages of the projects and was able to complete my projects on time. I gathered substantial engineering knowledge and expertise in my projects and grew in professional confidence.

I ensured safety and protection at all stages of the projects. I utilized personal protection equipment while working on various tasks during the projects.

CE 1.28, CE 1.29 CE 2.19, CE 2.28, CE 2.29 CE 3.16, CE 3.25

CE 1.23, CE 1.24, CE 2.23, CE 2.24, CE 3.24

PE3.6 Effective team membership and team leadership

I cooperated and coordinated with team members to ensure successful accomplishment of my projects. I resolved any conflicts which occurred among them in the workplace and ensured effective coordination among all of them.

I actively took part in daily and weekly meetings with the managers and the team members to discuss the progress of the projects and the issues which occurred during the execution of the projects.

I was also communicating with procurement management, project management, engineering, and finance departments.

Top 10 Reasons to choose MyCDRHelp.com

We hold the apex position in providing services regarding CDR writing for engineers Australia. We are known to have very high success records for consistent team of professional writers having years of experience in the field of CDR preparation. We provide the best and trusted service for CDR writing and reviewing of all kinds of engineering disciplines. We provide services for career episode writing, plagiarism check and removal etc.

  • Each section of the CDR is presented in a coherent form, while taking in account the pre-eminent features.
  • The summary statement for the applied occupation is given special attention, as it is the most proficient aspect of the CDR.
  • Utmost emphasis is laid on the various sections of the CDR, from introduction to Summary, in order to ensure that every segment is presented precisely.
  • Preparation of CDR is done by a comprehensive evaluation of the projects in order to provide details to cater to the requirements by Engineers Australia for Australian immigration Competency Demonstration Report.
  • Technical jargons are avoided and each error is corrected as well as any inadequacy is taken care of within the required time duration for the CDR to be approved by EA.
  • Each section of the CDR is assessed as per the standards laid down by MSA (Migration Skill Assessment Booklet) in order to provide meticulous CDR.
  • MyCDRHelp.com ensures the client that they will be provided with the best quality CDR, that abides by the Australian immigration standards framed by Engineers Australia.
  • The qualified connoisseurs apply an analytical process so that the achievements of the clients are in accordance with their desired position and educational lineup.
  • Appropriate Australian English is used by the professional writers to write the content of the CDR to make it affluent.
  • It is made sure by the professionals of MyCDRHelp.com that CDR complies with the Australian standards and consists of the desired characteristics of the required profession of the client.

Should you need any further information, please do not hesitate to contact us.

[email protected]

Contact: +61-4-8885-8110

WhatsApp: +61-4-8885-8110

(Australia, USA, UK, UAE, Singapore, New Zealand)