CDR sample civil engineer draft person

Career Episode 1 on CDR Sample Civil Engineer Draft Person

INTRODUCTION

Time duration July 2018 to December 2018
Location Mile End, Adelaide, South Australia
Organization TAFESA
Project Mile End Development
Position Student

[CE 1.1]

This career episode relates to project titled “Mile End Development’’. The project was assigned to me as a part of my Civil Engineering Draftsperson course at TAFESA.

TAFESA was established in the year 1935 offering more than 80 areas of industry and activity from last 47 years. TAFESA takes more than 70,000 students each year and it has more than 300 locations over South Australia. It is the largest vocational education and training (VET) and one of the largest in Australia. TAFESA also registered for higher education provider.

BACKGROUND

[CE 1.2]

A residential project in Adelaide involved land division, a new dwelling and modifications to the existing allotment. Referring to the Proposed Development Plan, the new allotment, will have a dwelling built on land that was previously the garden and rear yard of the existing allotment. The Proposed Dwelling including Garage and the Store in the existing allotment required the design of new footings. The Proposed Carport in the existing allotment required the design of structural framing and pad footings. Due consideration was to be given to the disposal of the additional stormwater runoff resulting from the development.

[CE 1.3]

Objective -

  1. Task A

    Examine the proposed development plan, the site drainage plan. I was needed to determine -

    • The peak stormwater runoff to the council drains from proposed new allotment B assuming that predevelopment, all stormwater was contained within the allotment.
    • The ARI (AEP) set by the council and any other regulatory requirements.
    • A pipe layout including RL’s to convey the stormwater and details for pipe and drain connections.
    • The pipe diameters required by council.
    • Standard pipe and drain connections required by council.
  2. Task B

    A construction report along with soil report was provided to me. I needed to -

    • Determine the magnitude of active movement (soil heave)
    • Determine the site classification
    • Design the footings for the proposed dwelling including garage
    • Design footing plans & cross sections complying with regulatory standards
  3. Task C

    Assuming the same soil condition for both allotments I needed to -

    • Design the footings for the proposed store
    • Draw footing plans & cross sections complying with regulatory standards
  4. Task D

    I also needed to -

    • Determine the design wind speed & wind actions for the carport
    • Design the carport using SHS columns, cold-formed purlins, custom orb roof sheeting & threaded rod bracing
    • Design plans, sections & connections details
    • Design the pad footings assuming a 125 mm thick concrete slab has been laid on the top

[CE 1.4]

The project Hierarchy is given below -

Civil engineer draft person

PERSONAL ENGINEERING ACTIVITY

CE [1.5]

My Roles & Responsibilities -

  • Project planning
  • Risk planning, WHS issues
  • Organizing team meeting & keeping track of the project proceedings
  • Involving on classification of the site e.g. soil type
  • Designing the carport of the existing building
  • Drawing the footing of the dwelling
  • Presentations & Documentations

CE [1.6]

The management of time in this project was a critical aspect and a luxury we can’t afford. I worked in synchronization with the team mates and our project supervisor through out the project. I also allocated roles & responsibilities to other team members. I resolved all the snags and glitches amid the team members during project completion. I reported the project proceeding to the supervisor on weekly basis and also compiled the final report for prior submission.

CE [1.7]

I designed the carport using SHS columns, cold-formed purlins, roof sheeting and threaded rod bracing. I classified site and made drawings. I performed site classification by determining active soil movement (soil heave). I also determined the wind speed and wind actions for the proposed dwelling.

I used AutoCAD, Revit Architectural and Revit Structural for the designing of the house.

During pipe line design for storm water drainage I was really stuck at numerous points. I worked with my supervisor and also researched over the internet resources to resolve the issue. I rechecked the established pipe network within the design software and found that I was not using the right application criterion. I selected the right tools and finished a proper and authentic design.

Soil Movement Calculations

I did soil movement calculations as following -

Civil engineer draft person

CE [1.8]

I introduced Gantt chart to track our work in a team which helped us a lot because it was developed clearly and what has all the details about every week job.

I divided the jobs amid the team and this helped us in balancing the work load and finishing the project well within stipulated timeframe. The lecturers and supervisor guided us in numerous occasions. I also took help from internet resources to carry out respective project work.

Since there were many areas where works were going on simultaneously every day I was interacting with my team mates to discuss regarding the targets to be achieved, safety procedures to be followed, scope of the work, regarding the allocation of the resources. Once in a week, we had a meeting with project supervisor who supervised us right way. We used to discuss about upcoming weeks work, resource allocation and what are the things were behind from us.

CE [1.9]

Engineering Codes/Standards followed -

  • NZ/AUS 1170- design actions
  • NZ/AUS 2070- residential slabs and footings

CE [1.10]

Summary

The project was successfully concluded. I was able to complete our project on time as well as my colleague too. I completed my project with high precision so that I got good result on it.

I was able to complete our project on time along with my team mates. I completed my project with high precision to deduce excellent results.

I was team leader for my project. I always communicated effectively with my colleagues, what needs to be done, what we are doing and what we going to do in next week. I had regular meeting with my team member to discuss on whether the project going on right track or not.

I also delivered a short presentation of what I have done for this project to explain the supervisor about what part of the work I have been involved in this project and how I helped the team to accomplish the project within stipulated time.

Learning from the project were -

  • Understanding of project scope
  • Team management
  • Problem solving techniques
  • AutoCAD and Revit software usage in real time
  • Site management
  • Multiple drawings and their illustrations

Top 10 Reasons to choose MyCDRHelp.com

We hold the apex position in providing services regarding CDR writing for engineers Australia. We are known to have very high success records for consistent team of professional writers having years of experience in the field of CDR preparation. We provide the best and trusted service for CDR writing and reviewing of all kinds of engineering disciplines. We provide services for career episode writing, plagiarism check and removal etc.

  • Each section of the CDR is presented in a coherent form, while taking in account the pre-eminent features.
  • The summary statement for the applied occupation is given special attention, as it is the most proficient aspect of the CDR.
  • Utmost emphasis is laid on the various sections of the CDR, from introduction to Summary, in order to ensure that every segment is presented precisely.
  • Preparation of CDR is done by a comprehensive evaluation of the projects in order to provide details to cater to the requirements by Engineers Australia for Australian immigration Competency Demonstration Report.
  • Technical jargons are avoided and each error is corrected as well as any inadequacy is taken care of within the required time duration for the CDR to be approved by EA.
  • Each section of the CDR is assessed as per the standards laid down by MSA (Migration Skill Assessment Booklet) in order to provide meticulous CDR.
  • MyCDRHelp.com ensures the client that they will be provided with the best quality CDR, that abides by the Australian immigration standards framed by Engineers Australia.
  • The qualified connoisseurs apply an analytical process so that the achievements of the clients are in accordance with their desired position and educational lineup.
  • Appropriate Australian English is used by the professional writers to write the content of the CDR to make it affluent.
  • It is made sure by the professionals of MyCDRHelp.com that CDR complies with the Australian standards and consists of the desired characteristics of the required profession of the client.

Should you need any further information, please do not hesitate to contact us.

[email protected]

Contact: +61-4-8885-8110

WhatsApp: +61-4-8885-8110

(Australia, USA, UK, UAE, Singapore, New Zealand)